PMP Study Guide 2026

Everything you need to pass the PMP exam in one place: the exam format, every topic to study, real practice questions with explanations, flashcards, and full-length practice tests. Free, no sign-up needed.

๐Ÿ“‹ PMP Exam Format at a Glance

180
Questions
230 min
Time Limit
61.00%
Passing Score

๐Ÿ“š PMP Topics to Study (69)

โœ๏ธ Sample PMP Questions & Answers

1. A project team uses Design of Experiments (DOE) to optimize a manufacturing process. What is the PRIMARY purpose of this technique?
โœ“ To statistically identify which variables most influence process outcomes

DOE is a statistical method used to systematically vary input factors and measure their effect on output, identifying critical variables.

2. During Control Quality, the team discovers that five deliverables have defects that can be repaired. These items are logged as:
โœ“ Validated defects requiring defect repair

Defects identified during Control Quality are documented and tracked so they can be repaired and then re-inspected.

3. Which engagement level describes a stakeholder who is aware of the project and its potential impacts but neither supportive nor resistant?
โœ“ Neutral

A 'Neutral' stakeholder is aware of the project and its impacts but has not taken a supportive or resistant stance.

4. In which type of contract does the buyer assume the highest level of cost risk, as the seller's profit increases directly with the project's costs?
โœ“ Cost Plus Percentage of Cost (CPPC)

The Cost Plus Percentage of Cost (CPPC) contract places the maximum cost risk on the buyer. In this contract type, the seller is reimbursed for all allowable costs, and their fee is calculated as a percentage of those costs. This creates a negative incentive for the seller to control costs, as higher costs lead to a higher profit. Due to this high risk for the buyer, CPPC contracts are rarely used.

5. In a hybrid project, the team uses Kanban for ongoing maintenance work alongside a waterfall phase for a major regulatory deliverable. What is the PRIMARY benefit of this arrangement?
โœ“ Each work stream uses the method best suited to its nature

Hybrid approaches allow organizations to apply the most suitable method to each distinct type of work within the same project.

6. Which document describes the type, format, and expected content of project status reports?
โœ“ Communications management plan

The communications management plan specifies the format, frequency, and content of project status reports and other communications.

๐ŸŽฏ Free PMP Practice Tests

๐Ÿ“– PMP Guides & Articles

Your PMP Study Path
1. Learn with Flashcards โ†’ 2. Drill Practice Tests โ†’ 3. Take the Full Exam Simulation

What Practice Test Geeks adds beyond an AI chat for PMP

An AI chatbot can quiz you, but it can't reproduce the exam conditions or keep your record. Here you get:

  • A timed, full-length PMP mock exam โ€” 180 questions in 230 minutes with a 61% pass mark, modeled on the official exam's question count and time limit, followed by a score report broken down by exam domain.
  • A fixed PMP question bank: the same test every attempt, so your score is comparable from one try to the next instead of changing with every regenerated quiz.
  • Progress saved on your device: completed tests, scores and missed questions stay in My Progress, so you can retake only what you got wrong.
  • A printable PMP cheat sheet you can print or save as a PDF.
  • PMP flashcards built from the same question bank.
  • Free PMP practice tests with the correct answer shown after each question.
Was this helpful?
PMP Study Guide 2026 โ€” Exam Format, Topics & Practice Questions