- Which of the following trap designs is expressly prohibited by the International Plumbing Code because it relies on moving parts to maintain its seal? → A trap with a float ball mechanism
- When connecting a dry vent pipe to a horizontal sanitary drainage pipe, which of the following describes the required connection point? → At or above the centerline of the horizontal drain
- According to the IPC, what happens to the trap seal when a nearby fixture discharges a large volume of water rapidly? → Induced siphonage can pull the trap seal out
- Under the IPC, what protection is required where drainage piping passes under a building foundation? → A sleeve or casing two pipe sizes larger must be used
- Under the IPC, when is an oil separator required on a drainage system? → When flammable liquids or oils may be discharged into the system
- Which of the following is an unacceptable location for a potable water service pipe according to the IPC? → Located in, under, or above a septic tank drainage field.
- Gray water that enters a collection reservoir must be ________. → Filtered
- A plumber is installing fixtures in a new commercial building. Which of the following is a requirement for water closets provided for public use? → They must be equipped with seats of the hinged open-front type.
- Per the IPC, what is required at the joint between a roof drain body and a structural concrete deck? → A clamping ring that secures waterproofing membrane to the drain body
- According to the IPC, 'clear-water waste' drainage systems handle discharge from sources such as: → Non-contaminated sources such as air conditioning condensate and swimming pool backwash
- What does the IPC specify regarding the use of used or reclaimed plumbing materials? → They may be used if approved by the code official
- A plumber is installing a new building sewer. According to the IPC, a cleanout is required at intervals of not more than: → 100 feet
- Under the IPC, when is a laundry interceptor required? → In commercial laundry facilities that may discharge lint, string, or rags
- Flux can only be used in the brazing process when: → Brazing copper to brass
- Under the IPC, what type of trap is specifically prohibited for use in drainage systems? → S-trap
- When flow controls are installed on gas piping, they __________. → Are used to keep operating pressure lower than the supply pressure
- What is the maximum amount of time that gray water is allowed to be retained for use to flush a toilet or urinal? → 72 hours
- Flexible water connections are required to be _________. → accessible
- Per the IPC, what is the maximum spacing allowed between cleanouts on a building storm drain? → 100 feet
- According to the IPC, what is the minimum distance a vent opening must be from any operable window or air intake? → 10 feet
- All pipes used in plumbing applications will have all of the following markings except: → Length of pipe
- Which of the following is NOT typically a power or duty of the code official as defined in Chapter 1 of the IPC? → To establish the fee schedule for permits and inspections.
- Per the IPC, the design rainfall intensity used for sizing storm drainage systems must be based on: → Rainfall data specific to the geographical location of the project
- Water heaters, hose bibs and sill cocks are normally protected from backflow with ________. → A vacuum breaker
- What does the IPC require regarding the grade of underground horizontal drainage piping? → A uniform grade throughout the entire run
- Under the IPC, what is the minimum frequency for cleaning a hydromechanical grease interceptor? → When it reaches 25% grease capacity
- Under the IPC, what type of valve is required on the water supply to each individual plumbing fixture? → An accessible shutoff valve
- According to the IPC, what is required for plumbing installations in seismic design categories D, E, and F? → Piping must be braced and supported for seismic forces
- What does the IPC require regarding the testing of backflow prevention assemblies after installation? → They must be tested immediately after installation and annually thereafter
- In a commercial building, the static water pressure from the city main is found to be 95 psi. What action is required by the IPC? → Install a pressure-reducing valve to reduce the pressure to 80 psi or less.
Turn these facts into recall:
What Practice Test Geeks adds beyond an AI chat for IPC
An AI chatbot can quiz you, but it can't reproduce the exam conditions or keep your record. Here you get:
- A timed, full-length IPC mock exam — 60 questions in 120 minutes with a 75% pass mark, modeled on the official exam's question count and time limit, followed by a score report broken down by exam domain.
- A fixed IPC question bank: the same test every attempt, so your score is comparable from one try to the next instead of changing with every regenerated quiz.
- Progress saved on your device: completed tests, scores and missed questions stay in My Progress, so you can retake only what you got wrong.
- IPC flashcards built from the same question bank.
- Free IPC practice tests with the correct answer shown after each question.
Was this helpful?