IEC Study Guide 2026
Everything you need to pass the IEC exam in one place: the exam format, every topic to study, real practice questions with explanations, flashcards, and full-length practice tests. Free, no sign-up needed.
๐ IEC Exam Format at a Glance
๐ IEC Topics to Study (63)
โ๏ธ Sample IEC Questions & Answers
1. How many 90-degree bends are permitted between pull points in a conduit run?
NEC 358.26, 344.26, and related articles limit total bends between pull points to 360 degrees (four 90-degree bends).
2. The current a motor draws at the instant of starting when full voltage is applied, before the rotor begins to turn, is known as what?
Locked-Rotor Current (LRC), also known as Locked-Rotor Amps (LRA), is the inrush current drawn by a motor at startup when the rotor is stationary ('locked'). This current is typically 6 to 8 times the motor's normal full-load current and is a critical value for sizing short-circuit protection and motor controllers.
3. Under NEC Article 210, which branch circuit type is required for bathroom receptacles in a dwelling unit?
NEC Section 210.11(C)(3) requires at least one 20-ampere branch circuit dedicated to bathroom receptacles in dwelling units.
4. The term 'effective ground-fault current path' as defined in the NEC is an intentionally constructed, permanent, low-impedance path that facilitates what?
An effective ground-fault current path is designed to carry enough fault current to quickly operate the overcurrent protective device and clear the fault.
5. When installing a panelboard in a residential garage, what NEC requirement applies?
NEC 110.26 requires a minimum of 36 inches of clear working space in front of electrical panels.
6. When installing a feeder to a detached garage with its own subpanel, which practice is critical for safety?
In a subpanel located in a separate building, the grounded (neutral) conductor and the equipment grounding conductor must be kept separate. A separate equipment grounding conductor must be run with the feeder conductors to provide the effective ground-fault current path back to the main service. Bonding the neutral and ground at the subpanel would create objectionable current on the grounding conductors. A grounding electrode system is also required at the detached structure.
๐ฏ Free IEC Practice Tests
๐ IEC Guides & Articles
What Practice Test Geeks adds beyond an AI chat for IEC
An AI chatbot can quiz you, but it can't reproduce the exam conditions or keep your record. Here you get:
- A timed, full-length IEC mock exam โ 80 questions in 240 minutes with a 70% pass mark, modeled on the official exam's question count and time limit, followed by a score report broken down by exam domain.
- A fixed IEC question bank: the same test every attempt, so your score is comparable from one try to the next instead of changing with every regenerated quiz.
- Progress saved on your device: completed tests, scores and missed questions stay in My Progress, so you can retake only what you got wrong.
- A printable IEC cheat sheet you can print or save as a PDF.
- IEC flashcards built from the same question bank.
- Free IEC practice tests with the correct answer shown after each question.